Ultimate Guide to Berlin's SolarPLUS Program: A Comprehensive Analysis of Applying for Balcony Solar Subsidies

- Transform Your Balcony into a "Green Power Station" and Enjoy up to €500 in Subsidies!

Ultimate Guide to Berlin's SolarPLUS Program: A Comprehensive Analysis of Applying for Balcony Solar Subsidies


- Transform Your Balcony into a "Green Power Station" and Enjoy up to €500 in Subsidies!


 


I. Overview of the SolarPLUS Program


In order to accelerate the energy transition, Berlin, Germany launched the SolarPLUS Program in 2022. As a core part of the SolarCity strategy, it aims to promote the installation of solar energy systems in households and small businesses. After the update in 2023, balcony photovoltaics (Balkonkraftwerke) and garden photovoltaics were included in the subsidy scope for the first time, providing urban residents with convenient green energy solutions.


Core Highlights:


- Subsidy Amount: Up to €500 per household (only for inverters and photovoltaic modules; energy storage devices are not subsidized)


- Applicable Power: Grid - connected systems ≤ 600W (suitable for apartment balconies and small gardens)


- Policy Dividends: No complicated approvals required. Tenants can also apply (with the landlord's consent)


- Quota Limit: Only 14,000 quotas in the whole of Berlin, first come, first served


 


II. Who is Eligible to Apply? Target Groups and Conditions


1. Target Groups:


- Berlin residents (tenants need to provide a consent letter from the landlord)


- Natural persons, small businesses (with less than 50 employees and an annual turnover of less than €10 million)


- Apartment residents (balcony or garden area ≥ 2㎡)


2. Equipment Requirements:


- Power Limit: Total output ≤ 600W (rated power of the micro - inverter)


- Compliance Certification: Must pass the VDE - AR - N 4105:2018 grid standard certification


- Installation Specification: Must be grid - connected. Off - grid systems do not enjoy subsidies


3. Prohibitions:


- Energy storage batteries (such as mobile power supplies) are not within the subsidy scope


- Projects with cash payments or down payments less than the subsidy amount are invalid


 


III. Installation Specifications and Benefit Analysis


1. Recommended Configuration:


- Photovoltaic Modules: 2×320W flexible solar panels (total power 640W, actually limited to 600W)


- Inverter: Micro - inverter (IP67 waterproof, suitable for 25 - 60V wide voltage)


- Installation Method: Clamp - type railing fixation, can be completed in 10 minutes by DIY


2. Economic Benefits:


- Annual Power Generation: Approximately 760kWh, covering 20% of household electricity demand


- Electricity Cost Savings: More than €150 per year on average (combined with EEG surplus power sales to the grid)


- Payback Period: 3 - 5 years (with the subsidy)


 


IV. Application Process: 7 Steps to Get Subsidies


Step 1: Pre - application Review


- Log in to the IBB Business Team GmbH official website to submit a pre - application, indicating the installation type (balcony/garden photovoltaics)


- Key Materials: Identity proof, property ownership certificate or lease contract, equipment technical parameters


Step 2: Wait for the Confirmation Letter


- The processing period is about 5 months (due to a surge in applications). During this period, you can screen suppliers, but do not sign contracts or install


- After receiving the confirmation email from IBB, you can enter the installation stage


Step 3: Equipment Procurement and Installation


- Choose certified suppliers (such as recommended brands Enphase, Huawei)


- Install by yourself or hire a licensed electrician (it is recommended to keep a video of the installation process)


Step 4: Submit Final Proofs


- Within 3 months after the installation is completed, submit the following to IBB:


- Electrician's qualification certificate


- Equipment purchase invoice (must indicate the inverter power)


- Grid - connection acceptance report


Step 5: Subsidy Disbursement


- After IBB's review and approval, the subsidy will be paid in one lump sum to the designated account


- Common Question: If the equipment malfunctions (such as a battery fire), there is no need to return the subsidy


 


V. Pit - Avoidance Guide and Expert Advice


1. Time Management:


- The quotas in 2025 are highly competitive. It is recommended to submit a pre - application immediately to seize the qualification


- Be sure to submit the materials within 3 months after installation. Late submissions will be invalid


2. Equipment Selection:


- Give priority to modular designs (such as 2×300W components) for easy future expansion


- Avoid energy storage bundled packages (no subsidy and increase costs)


3. Policy Linkage:


- Combine with the EEG surplus power sales to the grid policy, and the annual income can increase by another €50 - €100


- Apply for a KfW low - interest loan (interest rate < 2%) to reduce the initial investment


 


VI. Why Choose SolarPLUS?


- Environmental Contribution: Reducing carbon emissions by 1.2 tons per year ≈ planting 60 trees


- Economic Return: Payback within 5 years, and the lifetime net income exceeds €2000


- Policy Guarantee: CE/VDE certification + 10 - year warranty, ensuring safety


 


Act Now!

Visit the IBB official website to submit a pre - application, or use the Solargis tool to assess the power - generation potential of your balcony (Solargis Tutorial). Seize the green dividend and let the sun make money for you!


🌞 Berlin's SolarPLUS Program - The Starting Point of the Urban Energy Revolution

(Policy Consultation Hotline: +49 30 90172345, 9:00 - 17:00 on weekdays)


- **SolarPLUS Application**: [IBB Business Team GmbH](https://www.ibb.de/en

- **EEG Registration**: [Federal Network Agency](https://www.bundesnetzagentur.de

- **KfW Loans**: [KfW Renewable Energy Program](https://www.kfw.de


Note: The data in this article is as of February 2025. For policy changes, please refer to the official notice of IBB. The subsidy for energy storage equipment may be adjusted with the EU REPowerEU plan. It is recommended to keep an eye on it.